Caiso Nqc 2024. Zg was retained to perform deliverability, net qualifying capacity (nqc), and resource adequacy assessments for an existing 550 mw hydro. On september 10, 2021, energy division staff issued the elccs to be used for wind, solar, battery storage, and storage paired with renewables, for the 2023 and 2024 procurement requirements.
On september 10, 2021, energy division staff issued the elccs to be used for wind, solar, battery storage, and storage paired with renewables, for the 2023 and 2024 procurement requirements. The customer interface for resource adequacy (cira) system is used to manage the iso’s reliability requirements program.